Project intake
Send your electrical package for review
Send the drawings, BOQ or equipment list for the LV or MV package, with the project country and the date you need it. A partial package or a draft revision is fine.
Prefer email? Send documents to jk@sinospect.com.
Selected option: Review of an electrical supply package
Add a file link below, or email the package to jk@sinospect.com. Note the drawing revision you are working to.
What to send
- Drawings, BOQ or equipment list
- Drawing revision and voltage level (LV or MV)
- Project country and required date
Draft or incomplete information is acceptable for the first review.