Case studies

Supplied materials on site, factory tests and the checks behind a purchase. See the Chefchaouen supply in site photographs, then three examples of order control.

Steel-frame hall with cleanroom materials at the Chefchaouen site

Morocco · Cleanroom and facility systems

Cleanroom doors, windows and sandwich panels for a facility in Chefchaouen, Morocco

Sinospect supplied cleanroom doors, windows, door accessories and sandwich panels for a facility under construction in Chefchaouen. Photographs taken on 10 September 2026 show the panels in the hall and the construction setting.

Read the case

Further cases

A process plant in West Africa bought a complete backup power plant from a Chinese maker that Sinospect identified: two containerised 11 kV generating sets, the synchronising switchgear, a step-up transformer, a harmonic filter and a bulk fuel tank. Sinospect followed production and the factory tests, and after installation built the technical file that resolved an instability between the generators and the plant’s main load.

Read the case

A materials-research laboratory in France bought a custom 5-tonne (50 kN) hydraulic press that compacts powder under a vertical magnetic field, built by a works in Zhengzhou. Before shipment, Sinospect ran the factory acceptance test against the laboratory’s own acceptance protocol, measured the field with calibrated instruments, traced a failed pressing trial to the test powder, and closed every open point on the buyer’s written decision. After the buyer confirmed in writing that the test had succeeded, our final report of 7 September 2026 recommended release for packing.

Read the case

A food manufacturer in Morocco bought 350 g glass jars from a maker in China. It first tested pre-production samples on its own production line and approved them in writing. Sinospect kept those samples as the physical reference, measured nine production jars against them and arranged a 500-jar inspection of the two containers, 124,740 jars, which passed on 23 September 2026.

Read the case