Skip to content

Engineering · EPCM · Owner-side procurement

Factory work.Visible decisions.

Factory inspection and production monitoring in China, with the findings, follow-up actions and reports connected. Commission one equipment check or an agreed programme, with Workbench included in the delivery scope.

Start with the equipment, factory location and inspection window. Coverage and personnel are confirmed for the assignment.

SINOSPECTWORKBENCH
Inspection → finding → reviewed reportA result with its history.

The record retains the original finding, the correction and the retest result.

Illustrative example · invented recordsConcept sketch
One agreed scopeChina-side executionA visible decision recordSinospect service · Workbench included

Inspection & monitoring

See the issue. Follow the correction. Know who decides.

Sinospect follows the agreed inspection or factory acceptance test (FAT) scope and records what was observed, what remains open and what evidence supports the next decision.

Sinospect supplies industrial materials and equipment from qualified Chinese manufacturers. Workbench supports the engagement by connecting the technical file, agreed work, evidence and client review. Workbench comes with the service.

Review Sinospect’s company and delivery evidence

Evidence behind the next decision

A connected example, without a login.

Select a stage to see what changes and what still needs a decision. This illustration explains the method.

SINOSPECT / WORKBENCHEXAMPLE

Inspection scope · SYN-ITP-018

Witness point defined

CriterionIdentification
Agreed basisSYN-ITP-018

The example specifies the test criterion and evidence required.

Illustrative example · invented records

What the engagement produces

Inspection deliverables

An agreed inspection scope

Equipment, protocol, witness points, assignment discipline and reporting requirements defined before attendance.

Findings with follow-through

Observations, evidence references, supplier corrections and retest outcomes kept distinct and traceable.

A report for a decision

The reviewed record, open points and recommendation presented for the authority named in your contract.

The team delivers. Workbench keeps the work visible.

Sinospect can supply the package as your contractual counterparty. If you hold the factory contract, a separate appointment defines the procurement or inspection work. In either case, design decisions, deviations and final acceptance stay with you unless specifically delegated.

Where a statute, certification route or procurement procedure requires an accredited inspection body, a notified body or another authorised issuer, that party is appointed separately and issues its own certificate or report. Buyer acceptance and deviation authority remain as agreed in writing.

Start with one package

Start with the next factory decision.

Identify one equipment package or a programme of visits. Sinospect reviews the discipline, protocol, factory location and timing before confirming coverage, proposed personnel and commercial scope.

Scope an inspection package

Enquiry acknowledged within one business day. Initial written assessment, or a request for missing information, within two business days.

Useful starting information

  • Equipment and inspection or test protocol
  • Factory location and proposed date window
  • Required deliverable and approval responsibility

A single inspection, periodic surveillance and a specialist FAT are scoped differently. Remote document review and physical attendance are stated separately in the proposal.

Describe the scope first. Agree a secure transfer route before sending confidential drawings or technical files.

Before you start

Can you work with factories we already selected?

Yes. Under a buyer-direct appointment, you keep the factory contract and payment authority. Sinospect performs the inspection, monitoring and reporting scope specified in the appointment.

Can this cover several factories?

A programme can be scoped across defined packages and visits. Factory locations, disciplines, dates, continuity and backup arrangements are confirmed before appointment. Coverage outside China is confirmed for each proposed assignment.

Does a passing test release the equipment?

Sinospect records results and the relevant recommendation. Your contract defines who approves deviations, accepts the equipment or authorises release.

Can we review personnel and reporting requirements first?

Yes. Once the equipment and scope are defined, relevant personnel qualifications and reporting requirements can be reviewed, subject to availability and disclosure rights.

Explore the other service journeyElectrical supply & procurement
Buying generator equipment?Industrial power equipment supply