Skip to content

Equipment offer · energy equipment

Diesel engines for generator sets: power packs for assemblers

Bare power packs for genset assemblers (engine, fan, radiator and exhaust, with electronic governing), supplied on Sinospect's invoice. Each pack lists its rating; the price and engine series are stated on the quotation and the plant in the order contract.

Drawing of an open-frame diesel generating set: engine, alternator, radiator with fan, and control panel on a base frameComplete set, open frameRadiatorFanControl panelBase frameDiesel engineAlternator
per 50 kW power pack, FOB Qingdao
Price on quotation
prime power across the five packs
50–317 kW
radiator ambient rating on the packs
50 °C

Models and prices

Find the right configuration

Compare specifications
Choose a diesel engines for generator sets model

Select a model

5 models

PP-50

Power pack, 4-cylinder 3.9 litre, 50 kW prime

Engine, fan, radiator and exhaust for a 50 kVA class set, prime rating.

Price on quotationper pack

From 1 pack

FOB Qingdao

Lead time. About two weeks after the deposit, as stated by the maker

Rating
50 kW prime, 55 kW standby
Engine
4 cylinders, 3.9 litres, electronic governing
Scope
Engine, fan, radiator rated for 50 °C, exhaust
Warranty
12 months or 1,200 hours, handled through Sinospect

Documents. Maker's test certificate per engine; engine series stated on the quotation, plant named in the order contract.

PP-210

Power pack, 6-cylinder 8.3 litre, 210 kW prime

For a 200 kVA class set, prime rating.

Price on quotationper pack

From 1 pack

FOB Qingdao

Lead time. About two weeks after the deposit, as stated by the maker

Rating
210 kW prime, 231 kW standby
Engine
6 cylinders, 8.3 litres, electronic governing
Scope
Engine, fan, radiator rated for 50 °C, exhaust
Warranty
12 months or 1,200 hours, handled through Sinospect

Documents. Maker's test certificate per engine; engine series stated on the quotation, plant named in the order contract.

PP-220

Power pack, 6-cylinder 8.9 litre, 220 kW prime

For a 200 kVA class set, prime rating.

Price on quotationper pack

From 1 pack

FOB Qingdao

Lead time. About two weeks after the deposit, as stated by the maker

Rating
220 kW prime, 240 kW standby
Engine
6 cylinders, 8.9 litres, electronic governing
Scope
Engine, fan, radiator rated for 50 °C, exhaust
Warranty
12 months or 1,200 hours, handled through Sinospect

Documents. Maker's test certificate per engine; engine series stated on the quotation, plant named in the order contract.

PP-250

Power pack, 6-cylinder 9.5 litre, 250 kW prime

For a 275 kVA class set, prime rating.

Price on quotationper pack

From 1 pack

FOB Qingdao

Lead time. About two weeks after the deposit, as stated by the maker

Rating
250 kW prime, 280 kW standby
Engine
6 cylinders, 9.5 litres, electronic governing
Scope
Engine, fan, radiator rated for 50 °C, exhaust
Warranty
12 months or 1,200 hours, handled through Sinospect

Documents. Maker's test certificate per engine; engine series stated on the quotation, plant named in the order contract.

PP-317

Power pack, 6-cylinder 14 litre, 317 kW prime

For a 350 kVA class set, prime rating.

Price on quotationper pack

From 1 pack

FOB Qingdao

Lead time. About two weeks after the deposit, as stated by the maker

Rating
317 kW prime, 351 kW standby
Engine
6 cylinders, 14 litres, electronic governing
Scope
Engine, fan, radiator rated for 50 °C, exhaust
Warranty
12 months or 1,200 hours, handled through Sinospect

Documents. Maker's test certificate per engine; engine series stated on the quotation, plant named in the order contract.

Price on quotation. A dated quotation confirms the price and delivery point for your quantities.

The models compared

Specification comparison of the diesel engines for generator sets models
SpecificationPP-50PP-210PP-220PP-250PP-317
Price

Price on quotationper pack, from 1 pack

Price on quotationper pack, from 1 pack

Price on quotationper pack, from 1 pack

Price on quotationper pack, from 1 pack

Price on quotationper pack, from 1 pack

Price basisFOB QingdaoFOB QingdaoFOB QingdaoFOB QingdaoFOB Qingdao
Rating50 kW prime, 55 kW standby210 kW prime, 231 kW standby220 kW prime, 240 kW standby250 kW prime, 280 kW standby317 kW prime, 351 kW standby
Engine4 cylinders, 3.9 litres, electronic governing6 cylinders, 8.3 litres, electronic governing6 cylinders, 8.9 litres, electronic governing6 cylinders, 9.5 litres, electronic governing6 cylinders, 14 litres, electronic governing
ScopeEngine, fan, radiator rated for 50 °C, exhaustEngine, fan, radiator rated for 50 °C, exhaustEngine, fan, radiator rated for 50 °C, exhaustEngine, fan, radiator rated for 50 °C, exhaustEngine, fan, radiator rated for 50 °C, exhaust
Warranty12 months or 1,200 hours, handled through Sinospect12 months or 1,200 hours, handled through Sinospect12 months or 1,200 hours, handled through Sinospect12 months or 1,200 hours, handled through Sinospect12 months or 1,200 hours, handled through Sinospect
Lead timeAbout two weeks after the deposit, as stated by the makerAbout two weeks after the deposit, as stated by the makerAbout two weeks after the deposit, as stated by the makerAbout two weeks after the deposit, as stated by the makerAbout two weeks after the deposit, as stated by the maker

Emissions and noise certification for the destination are quoted per order; the packs ship with the maker's test certificate and declaration.

A witnessed load test with Sinospect's engineer present can be added to any order.

A power pack or a complete set?

Scope of a bare diesel engine power packPower pack, as suppliedRadiator, 50 °CFanDiesel engineelectronic governingEngineExhaustAdded by the assemblerAlternatorControl panel, breakerBase frame, tankGS-50 to GS-275 include both scopes, open-frame. A canopy is quoted separately.
What a bare power pack includes: engine with electronic governing, fan, radiator rated for 50 °C ambient and the exhaust connection. Alternator, base frame and controls belong to the assembler, or to a complete set.

Supply terms

What the price includes

Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.

Engagement models
One quotation, one invoice

Sinospect quotes, contracts and invoices as the supplier. The quotation states the engine or product series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.

Inspection before shipment

Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.

FOB a named Chinese port

Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.

Warranty through Sinospect

A warranty issue comes to Sinospect, which investigates against the agreed specification and acceptance evidence and coordinates the remedy with the maker.

Documents and conformity

Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.

Request a quotation

Model, quantity, destination

Name the models by their codes, the quantity of each and the destination port or city. The quotation confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.

Models
Use the codes above; several models can share one request.
Quantity
State the quantity of each model.
Destination
Your port or city, with the country.

Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.

Required

Add optional project details

We acknowledge your request within one business day. You receive an initial written assessment — or a request for the missing information — within two business days.

Your inquiry is reviewed by Sinospect and handled under our Privacy Policy. Any factory disclosure needed for the project is agreed with you separately. For highly sensitive material, request a protected exchange before sending the files.

Questions buyers ask first

Which engine series are supplied?

The quotation states the engine series and licence; the order contract names the plant. Each engine comes with the maker's test certificate. The page lists ratings and displacement.

Are the packs from stock?

Availability is confirmed on the quotation for the quantity requested; nothing on this page is a stock statement.

Can the radiator be rated differently?

Yes. The packs are quoted with radiators for 50 °C ambient; other ratings and remote-radiator versions are quoted per order.

What does the set class mean?

It is the prime rating of the complete set at 0.8 power factor and 50 Hz. The kW on each pack is engine output, before alternator losses, so the set delivers less than the engine. The quotation confirms the class against your alternator and site conditions.

Engine power packs: more from Sinospect

Price on quotation, FOB the port stated, for the quantities requested. The dated quotation confirms the price, delivery point and validity period.