Equipment offer · energy equipment
Diesel generating sets: open-frame models from 50 to 275 kVA, larger sets to 2,000 kVA
Complete open-frame diesel generating sets of 200 and 275 kVA prime power (PRP), and a 50 kVA model. Price on quotation, from one unit, FOB Ningbo, with a load test at the factory and Sinospect's inspection of your order before shipment. Larger sets, from 500 to 2,000 kVA, are quoted per project.

- complete sets, open frame
- 50, 200, 275 kVA
- minimum order
- 1 set
- price basis, export packing included
- FOB Ningbo
Models
Find the right configuration
Price on quotation. A dated quotation confirms the price and delivery point for your quantities.
Indicative FOB Ningbo reference bands (single-unit basis)
Reference budget bands per complete 400/230 V, 50 Hz set supplied on Sinospect's invoice (open-book supply margin, factory load test and pre-shipment inspection included). Exact pricing is confirmed on a dated quotation against your configuration and quantity.
| Model | Chinese engine series (open / soundproof) | Joint-venture Cummins series (open / soundproof) | 40 ft HC container loading |
|---|---|---|---|
| GS-50 · 50 kVA PRP | USD 5,100–5,900 open · USD 5,800–6,600 canopy | USD 6,700–7,700 open · USD 7,400–8,250 canopy | Up to 10 canopy sets (4 per 20 ft) |
| GS-200 · 200 kVA PRP | USD 10,800–13,900 open · USD 11,600–15,900 canopy | USD 16,500–18,200 open · USD 17,400–19,850 canopy | Up to 5 canopy sets (1–2 per 20 ft) |
| GS-275 · 275 kVA PRP | USD 13,900–16,800 open · USD 15,100–18,100 canopy | USD 18,900–21,450 open · USD 20,050–22,450 canopy | Up to 3–4 canopy sets (1–2 open per 20 ft) |
Video
What a set comprises
The models compared
Open comparisonClose comparison
| Specification | GS-200 | GS-275 | GS-50 |
|---|---|---|---|
| Price basis | FOB Ningbo | FOB Ningbo | FOB Ningbo |
| Prime power (PRP) | 200 kVA | 275 kVA | 50 kVA |
| Voltage and frequency | 400/230 V, 50 Hz; 60 Hz on request | 400/230 V, 50 Hz; 60 Hz on request | 400/230 V, 50 Hz; 60 Hz on request |
| Build | Open frame; canopy, automatic transfer switch (ATS) and synchronising quoted per order | Open frame; canopy, automatic transfer switch (ATS) and synchronising quoted per order | Open frame; canopy, automatic transfer switch (ATS) and synchronising quoted per order |
| Configuration | Engine series, alternator and controller specifications stated on the quotation | Engine series, alternator and controller specifications stated on the quotation | Engine series, alternator and controller specifications stated on the quotation |
| Test | Load test at the factory, with the test record sent before shipment | Load test at the factory, with the test record sent before shipment | Load test at the factory, with the test record sent before shipment |
| Fuel consumption (75% / 100% PRP) | ~32 / 42 L/h (typical; exact curve on engine datasheet) | ~43 / 57 L/h (typical; exact curve on engine datasheet) | ~8.5 / 11.2 L/h (typical; exact curve on engine datasheet) |
| Container loading (reference) | 1–2 soundproof sets per 20 ft; up to 5 per 40 ft HC | 1–2 open-frame sets per 20 ft; up to 3–4 soundproof sets per 40 ft HC | Up to 4 soundproof sets per 20 ft; up to 10 per 40 ft HC |
| Lead time | Stated on the dated quotation | Stated on the dated quotation | Stated on the dated quotation |
What a quotation covers
What every 50–275 kVA set includes, and what is quoted per order
You receive the factory test record and Sinospect's inspection report before you pay the balance.
With every listed set
- Engine, alternator, base frame, radiator and control panel
- Load test at the factory, with the test record sent before shipment
- Sinospect's inspection of your order before shipment, with a photo report
- Export packing and loading at the port, FOB Ningbo
Quoted per order
- Soundproof canopy, automatic transfer switch (ATS) and synchronising
- A factory test witnessed by a Sinospect engineer, with the readings at each load step
- Sea or air freight, insurance, duties and clearance at the destination, on request or through your forwarder
Fixed on the dated quotation
- The price for your quantities and the delivery point
- The engine series and the proposed configuration, including the alternator and controller specification
- The lead time and the validity period
- The deposit with the order and the balance after the inspection report, before shipment
The order contract names the maker and its plant. The documents that ship with each set are the factory load-test record and the maker's declaration.
Larger sets, on quotation
From 500 to 2,000 kVA, sized to your load
For a plant, a mine or grid backup, larger sets are quoted per project against your load list. The quotation states the engine series and the proposed configuration, including the alternator and controller specification; the order contract names the maker and its plant. The last sets of this class we followed were two 2 MVA, 11 kV units with Cummins QSK60 engines, Stamford alternators and Deep Sea controllers.
- Power
- 500 to 2,000 kVA per set; several sets synchronised for a larger load
- Voltage
- 400/230 V, or medium voltage such as 11 kV, 50 or 60 Hz
- Build
- Open frame, soundproof canopy, or a 20 or 40 ft container
- Duty
- Standby, prime or continuous; synchronising switchgear and fuel storage quoted with the sets
- Factory test
- A load test up to full prime power can be written into the order and witnessed by our engineer, with the readings at each load step in the report
Tell us if the load includes rectifiers, variable-speed drives or large motors: they decide the alternator, the voltage regulator and the test programme.

Supply terms
What the price includes
Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.
One quotation, one invoice
Sinospect quotes, contracts and invoices as the supplier. The quotation states the engine series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.
Inspection before shipment
Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.
FOB a named Chinese port
Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.
Warranty from Sinospect
Equipment you buy from Sinospect carries our own warranty: you claim from us, and we deal with the maker. It covers defects in materials and workmanship for 12 months from commissioning, or from delivery where no commissioning is needed, and ends no later than 18 months after shipment. Generating sets and engines: 12 months or 1,200 running hours, whichever comes first. Where the maker gives a longer warranty, the longer term passes to you. We repair or replace the faulty part and ship parts at our cost; if an engineer has to visit you abroad, the visit is quoted before anyone travels.
Documents and conformity
Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.
Request a quotation
What to send for a quotation
A first answer needs only the rating, the quantity and the destination. The rest can follow; we confirm each assumption on the quotation.
- Rating
- kVA, prime or standby, and the model code if one fits.
- Electrical
- Voltage and frequency, and any rectifiers, variable-speed drives or large motors in the load.
- Build
- Open frame or canopy; ATS or synchronising if you need them.
- Order
- Quantity of each set, the destination port or city, and the date you need them.
Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.
Questions buyers ask first
What does the quotation say about the engine and alternator?
The quotation states the engine series and the proposed configuration, including the alternator and controller specification; the order contract names the maker and its plant. Each set ships with its load-test record and the maker's declaration.
Are the canopy and the transfer switch included?
The sets are offered open frame. The canopy, the automatic transfer switch (ATS) and synchronising are quoted separately, for each order.
How are the sets tested before shipment?
Each set passes a load test at the factory, and the test record is sent before shipment. A test witnessed by a Sinospect engineer can be added to any order. Sinospect then inspects the order and sends the photo report.
What is the lead time?
The lead time is stated on the dated quotation, with the price for your quantities and the delivery point.
Are freight and customs clearance included?
Set prices are FOB Ningbo and power-pack prices FOB Qingdao, export packing and loading at the port included. Sea or air freight, insurance, duties and customs clearance at the destination are quoted on request, or handled by your forwarder.
What are the payment terms?
A deposit with the order, then the balance before shipment, after the inspection report. The split between the two is set on the quotation.
Can you supply sets of 500 kVA and above?
Yes. Sets from 500 to 2,000 kVA, at low or medium voltage, open, in a canopy or in a container, and synchronised in groups, are quoted per project against your load list. A load test up to full prime power can be written into the order and witnessed by our engineer.
Bare power packs, for assemblers
Engine with electronic governing, radiator rated for 50 °C ambient with fan and guard, air cleaner, exhaust silencer, starter motor and charging alternator, filters and mounting feet, from 50 to 317 kW prime power (PRP). Each engine ships with the maker's test certificate, and carries Sinospect's warranty of 12 months or 1,200 hours. The quotation states the engine series and the lead time; the order contract names the plant. The set class is the complete set's prime rating at 0.8 power factor and 50 Hz; the kW figure is engine output, before alternator losses. The quotation confirms the class against your alternator and site conditions.
| Power pack | Prime power (PRP) | Set class (prime) |
|---|---|---|
| PP-50 | 50 kW | 50 kVA |
| PP-210 | 210 kW | 200 kVA |
| PP-220 | 220 kW | 200 kVA |
| PP-250 | 250 kW | 275 kVA |
| PP-317 | 317 kW | 350 kVA |
Generating sets: more from Sinospect
- Diesel engine power packs
- Generating sets and power equipment
- Generator FAT witnessing
- Buyer’s guide: diesel generating sets from China
- Who makes the engines in Chinese sets
Prices are FOB the port stated, for the quantities requested. The dated quotation confirms the price, delivery point and validity period.