Priced offer · food equipment
Bakery equipment: sheeter, oven, retarder-proofer, mixer and display
The machines a bakery or café installs first, quoted from makers in Guangzhou, Yangzhou and Shandong and supplied on Sinospect's invoice with a test run on video and an inspection before shipment. Trays of 460 × 660 mm (18 × 26 in) are built to order where stated.

- per dough sheeter, 520 mm belt
- USD 1,475
- per ten-tray convection oven with steam
- USD 2,865
- per ETL-listed five-pan oven, 208 V or 240 V
- USD 1,725
Models and prices
Find the right configuration
Prices are per unit in US dollars, FOB the Chinese port stated, at the quantity shown. A dated quotation confirms the price, the maker and the delivery point for your quantities.
The models compared
Open comparisonClose comparison
| Specification | BK-SH520 | BK-CO10 | BK-RP18 | BK-SM60 | BK-DF18 | BK-CO5E |
|---|---|---|---|---|---|---|
| Price | USD 1,475per machine, from 1 machine | USD 2,865per oven, from 1 oven | USD 1,800per cabinet, from 1 cabinet | USD 1,135per mixer, from 1 mixer | USD 788per unit, from 1 unit | USD 1,725per oven, from 1 oven |
| Price basis | FOB Guangzhou | FOB Guangzhou | FOB Guangzhou | FOB Shanghai | FOB Qingdao | FOB Qingdao |
| Belt | 520 mm | — | — | — | — | — |
| Size | Open 254 × 95 × 123.5 cm; folded 135 × 95.5 × 166 cm | 90 × 123.5 × 179 cm; packed 94 × 130 × 190 cm | 67 × 100 × 205 cm | 88 × 53 × 92 cm; packed 96 × 61 × 107 cm | About 800 × 600 × 1800 mm, built to order | 38 × 46 × 54 in; two stacked 62 in high |
| Power | 0.75 kW; 220 or 380 V 50 Hz as quoted | 14.8 kW; 380 or 220 V 50 Hz as quoted | 2.2 kW; 220 V 50 Hz single phase as quoted | 2.2 kW; 220/380 V | — | — |
| Mass | 230 kg | 300 kg | — | 180 kg; 200 kg packed | — | — |
| Warranty | One year on the structure; wear parts excluded | One year from the factory | — | — | — | Parts for one year; labour excluded |
| Trays | — | Ten trays of 460 × 660 mm, built to order | Eighteen trays of 460 × 660 mm | — | — | — |
| Steam | — | Adjustable release interval | — | — | — | — |
| Range | — | — | 2 to 50 °C; humidity to 99% | — | — | — |
| Build | — | — | 430 stainless outside, 201 inside, 50 mm insulation, double-glazed door | — | — | — |
| Test | — | — | Test video before shipping | — | — | — |
| Batch | — | — | — | 22 to 25 kg of flour, about 35 to 40 kg of dough; smallest batch 5 kg of flour | — | — |
| Speeds | — | — | — | 125 and 250 rpm | — | — |
| Shelves | — | — | — | — | Four, open front | — |
| Supply | — | — | — | — | Voltage and frequency confirmed on the quotation | 208 V three-phase, 10 kW, 31 A, hard-wired; or 240 V single-phase |
| Packing | — | — | — | — | Export packing included | — |
| Pans | — | — | — | — | — | Five pans of 18 × 26 in per oven; two ovens stack with a kit (USD 101) |
| Listing | — | — | — | — | — | ETL c-us and ETL Sanitation, the maker's listed model numbers |
| Convection | — | — | — | — | — | Dry; no steam |
| Lead time | About three weeks after the deposit | About three to four weeks after the deposit | About three weeks after the deposit | About two weeks after the deposit | About three weeks after the deposit | About four weeks after the deposit |
Machines quoted at 50 Hz are built for 50 Hz markets; 60 Hz versions and North American listings (UL, ETL, NSF) exist for the five-pan oven and are quoted per order for the others.
Every machine is run at the factory before packing; the test video and the inspection photographs are sent before the balance is paid.
Supply terms
What the price includes
Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.
Engagement modelsOne quotation, one invoice
Sinospect quotes, contracts and invoices as the supplier. The maker, its plant and the engine or product series are named on the dated quotation, together with the sample or drawing the order is built to.
Inspection before shipment
Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.
FOB a named Chinese port
Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.
Warranty through Sinospect
A warranty issue comes to Sinospect, which investigates against the agreed specification and acceptance evidence and coordinates the remedy with the maker.
Documents and conformity
Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.
Request a quotation
Model, quantity, destination
Name the models by their codes, the quantity of each and the destination port or city. The quotation names the maker, confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.
- Models
- Use the codes above; several models can share one request.
- Quantity
- State the quantity of each model.
- Destination
- Your port or city, with the country.
Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.
Questions buyers ask first
Which machines run on 60 Hz?
The five-pan oven is built for 208 V or 240 V 60 Hz and carries ETL listings. The sheeter, ten-tray oven, retarder-proofer and mixer are quoted at 50 Hz; 60 Hz versions are confirmed per order.
Can tray sizes be changed?
The ten-tray oven and the retarder-proofer are built for 460 × 660 mm trays to order; 400 × 600 mm is the makers' standard.
Is installation included?
No. Freight, duty, installation and local service are quoted separately or handled by the buyer's own trades.
Other priced offers
- Hospital beds
- Wheelchairs
- Charcoal rotisserie pits
- Engine power packs and gensets
- PPE and sterilisation consumables
- All priced offers
Prices published 10 October 2026 from makers’ quotations of September and October 2026, FOB the port stated, for the quantities shown. Indicative until confirmed on a dated quotation, which stays valid for the period it states.