Priced offer · healthcare equipment
Wheelchairs, steel, aluminium, transport, bariatric and reclining
Five wheelchair models for hospital stores, distributors and care providers, supplied on Sinospect's invoice with an inspection of the order before it ships. Prices are per chair at the quantity shown.

- per chair, steel self-propelled, 100 chairs
- USD 73
- per chair, aluminium self-propelled, 10 chairs
- USD 163
- minimum chairs, by model
- 10 to 100
Models and prices
Find the right configuration
Prices are per unit in US dollars, FOB the Chinese port stated, at the quantity shown. A dated quotation confirms the price and the delivery point for your quantities.
The models compared
Open comparisonClose comparison
| Specification | WC-ST | WC-AL | WC-TR | WC-BA | WC-RC |
|---|---|---|---|---|---|
| Price | USD 73per chair, from 100 chairs | USD 163per chair, from 10 chairs, 46 cm seat USD 169per chair, from 100 chairs, 51 cm seat | USD 83per chair, from 30 chairs | USD 150per chair, from 50 chairs | USD 118per chair, from 30 chairs |
| Price basis | FOB Chinese port | FOB Chinese port | FOB Chinese port | FOB Chinese port | FOB Chinese port |
| Frame | Steel, powder-coated | Aluminium, powder-coated, oval tube 25 × 2.2 mm | Aluminium | Steel, powder-coated; leather upholstery | — |
| Seat | 46 cm; 51 cm to order at extra cost | 46 cm standard; 51 cm to order | — | 56 cm; 51 or 61 cm to order | — |
| Wheels | 24-inch rear | 24-inch quick-release pneumatic rear, 6-inch PU casters | 12-inch rear; 16-inch version at the same price | 24-inch rear, 8-inch front | — |
| Mass | 19 kg net, 20 kg gross | 16 kg net, 18 kg gross; folded 27 cm | 11.5 kg net, 13.4 kg gross | 25.9 kg net, 28 kg gross | 26 kg net, 28.7 kg gross |
| Carton | 95 × 26 × 96 cm | 84 × 32 × 100 cm | 71 × 28 × 75 cm | 86 × 31.5 × 94 cm | 107.5 × 33 × 86 cm |
| Brakes | — | Hand brake and attendant brake | — | — | — |
| Arms and legs | — | Flip-up arms, detachable swing-away leg rests | — | Detachable arms, elevating leg rests | — |
| Propulsion | — | — | Attendant-propelled | — | — |
| Load | — | — | — | 227 kg, stated by the maker; no tested-mass report on file | — |
| Back | — | — | — | — | High back, reclining, head support |
| Legs | — | — | — | — | Elevating leg rests |
| Lead time | Three to four weeks after the deposit | Three to four weeks after the deposit | Three to four weeks after the deposit | Three to four weeks after the deposit | Three to four weeks after the deposit |
Chairs ship with the maker's declaration of conformity. ISO 7176 test reports are commissioned per order where a tender or registration requires them.
Import conformity programmes at the destination are quoted per order.
Supply terms
What the price includes
Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.
Engagement modelsOne quotation, one invoice
Sinospect quotes, contracts and invoices as the supplier. The quotation states the engine or product series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.
Inspection before shipment
Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.
FOB a named Chinese port
Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.
Warranty through Sinospect
A warranty issue comes to Sinospect, which investigates against the agreed specification and acceptance evidence and coordinates the remedy with the maker.
Documents and conformity
Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.
Request a quotation
Model, quantity, destination
Name the models by their codes, the quantity of each and the destination port or city. The quotation confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.
- Models
- Use the codes above; several models can share one request.
- Quantity
- State the quantity of each model.
- Destination
- Your port or city, with the country.
Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.
Questions buyers ask first
Is a sample available before the order?
Yes. A sample chair is quoted at the unit price plus courier, and the sample stays the reference for the inspection of the order.
What is the minimum order?
The minimum is per model, from 10 chairs for WC-AL to 100 for WC-ST. Models can be combined in one shipment.
Can seat widths be changed?
Yes. The 46 cm seat is standard; 51 cm and, for the bariatric chair, 61 cm are made to order at a quoted extra.
Other priced offers
- Hospital beds
- Charcoal rotisserie pits
- Diesel engines for generator sets
- Generating sets
- PPE and sterilisation consumables
- All priced offers
Prices published 10 October 2026, FOB the port stated, for the quantities shown. Indicative until confirmed on a dated quotation, which stays valid for the period it states.