Skip to content

Priced offer · commercial kitchen equipment

Charcoal chicken rotisserie pits, flat baskets or skewers

Self-turning charcoal rotisseries for quick-service restaurants and caterers, in Sinospect's flat-basket arrangement or a standard range. A seven-basket flat-basket pit roasts 35 butterflied chickens per load; two side by side give 70.

Stainless steel charcoal rotisserie pits with hoods and flat baskets on casters, photographed at the workshop
per seven-basket pit, FOB Qingdao
USD 1,180
per load, five per flat basket
35 birds
stainless steel body and baskets
304

Models and prices

Find the right configuration

Compare specifications
Choose a charcoal rotisserie pits model

Select a model

4 models

Open charcoal rotisserie pit showing flat wire baskets on their shafts

RP-7

Flat-basket charcoal pit, seven baskets, hood

Seven clamshell baskets of 1000 × 230 × 80 mm turning together on a chain drive over a firebrick-lined charcoal bed.

USD 1,180per pit

From 1 unit

FOB Qingdao

Lead time. About two weeks after the deposit

Capacity
7 flat baskets, 5 butterflied chickens each, 35 per load
Baskets
1000 × 230 × 80 mm, removable, all identical
Material
304 stainless steel body and baskets
Fuel
Charcoal on firebrick
Drive
Geared motor, chain drive, baskets turn in step
Motor
110 V 60 Hz or 220 V 50 Hz, to order
Mobility
Casters; brakes and export crate confirmed on the quotation
Layout
Two seven-basket pits side by side for 70 birds, motors on the outer ends

Documents. Sinospect's flat-basket layout drawing; the quotation confirms the 304 stainless steel specification, dimensions, mass and electrical details.

Five-basket stainless steel charcoal rotisserie with lids

RP-5F

Charcoal rotisserie, five baskets

Standard five-basket unit, 1430 × 980 × 1000 mm.

USD 2,945per unit

From 1 unit

FOB Shenzhen

Lead time. About three weeks after the deposit

Capacity
5 baskets
Size
1430 × 980 × 1000 mm
Material
304 stainless steel
Motor
110 V or 220 V at the same price

Documents. Catalogue sheet; quantity prices on quotation.

Eight-basket stainless steel charcoal rotisserie with lids

RP-8F

Charcoal rotisserie, eight baskets

Standard eight-basket unit, 2430 × 980 × 1000 mm, 0.37 kW, 2 rpm.

USD 4,665per unit

From 1 unit

FOB Shenzhen

Lead time. About three weeks after the deposit

Capacity
8 baskets
Size
2430 × 980 × 1000 mm
Material
304 stainless steel
Motor
0.37 kW, 2 rpm; 110 V or 220 V at the same price

Documents. Catalogue sheet; quantity prices on quotation.

Skewer-type charcoal rotisserie with a row of motorised skewers
RS-1350 to RS-2150View photograph

RS-1350 to RS-2150

Skewer rotisseries, 1350 to 2150 mm

Skewer-type charcoal rotisseries in four lengths, 220 V, 0.9 kW.

USD 1,200per unit

From 1 unit, 1350 mm

USD 1,415per unit

From 1 unit, 1650 mm

USD 1,635per unit

From 1 unit, 1950 mm

USD 1,845per unit

From 1 unit, 2150 mm

FOB Shanghai, confirmed on quotation

Lead time. About three weeks after the deposit

Type
Skewers, not flat baskets
Lengths
1350, 1650, 1950 or 2150 mm
Motor
220 V, 0.9 kW

Documents. Price list and photographs; specification sheet with the quotation.

Prices are per unit in US dollars, FOB the Chinese port stated, at the quantity shown. A dated quotation confirms the price and the delivery point for your quantities.

The models compared

Specification comparison of the charcoal rotisserie pits models
SpecificationRP-7RP-5FRP-8FRS-1350 to RS-2150
Price

USD 1,180per pit, from 1 unit

USD 2,945per unit, from 1 unit

USD 4,665per unit, from 1 unit

USD 1,200per unit, from 1 unit, 1350 mm

USD 1,415per unit, from 1 unit, 1650 mm

USD 1,635per unit, from 1 unit, 1950 mm

USD 1,845per unit, from 1 unit, 2150 mm

Price basisFOB QingdaoFOB ShenzhenFOB ShenzhenFOB Shanghai, confirmed on quotation
Capacity7 flat baskets, 5 butterflied chickens each, 35 per load5 baskets8 baskets—
Baskets1000 × 230 × 80 mm, removable, all identical———
Material304 stainless steel body and baskets304 stainless steel304 stainless steel—
FuelCharcoal on firebrick———
DriveGeared motor, chain drive, baskets turn in step———
Motor110 V 60 Hz or 220 V 50 Hz, to order110 V or 220 V at the same price0.37 kW, 2 rpm; 110 V or 220 V at the same price220 V, 0.9 kW
MobilityCasters; brakes and export crate confirmed on the quotation———
LayoutTwo seven-basket pits side by side for 70 birds, motors on the outer ends———
Size—1430 × 980 × 1000 mm2430 × 980 × 1000 mm—
Type———Skewers, not flat baskets
Lengths———1350, 1650, 1950 or 2150 mm
Lead timeAbout two weeks after the depositAbout three weeks after the depositAbout three weeks after the depositAbout three weeks after the deposit

Electrical safety certification for the destination (CE, CSA or equivalent) is quoted per order; the seven-basket pit ships with the maker's declaration.

Each pit is run under power at the workshop before packing and photographed with its crate.

The flat-basket layout

Plan view of two seven-basket charcoal rotisserie pits side by side, motors on the outer endsEach pit body is 2,000 mm long and 1,300 mm deep; with the two motor boxes the pair is about 4,550 mm long. Each pit holds seven 1,000 × 230 mm baskets at a 250 mm pitch, five chickens per basket.About 4,550 overall, with the motor boxesMMPit 1: 7 baskets, 35 birds2,000Pit 2: 7 baskets, 35 birds2,0001,300bodyFront, operator sideBaskets 1,000 × 230 mm at a 250 mm pitch, five butterflied chickens each. M: geared motor.
The 70-bird layout in plan: two seven-basket pits side by side, motors on the outer ends. Dimensions are targets in millimetres; the quotation confirms the final dimensions and build.

Supply terms

What the price includes

Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.

Engagement models
One quotation, one invoice

Sinospect quotes, contracts and invoices as the supplier. The quotation states the engine or product series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.

Inspection before shipment

Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.

FOB a named Chinese port

Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.

Warranty through Sinospect

A warranty issue comes to Sinospect, which investigates against the agreed specification and acceptance evidence and coordinates the remedy with the maker.

Documents and conformity

Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.

Request a quotation

Model, quantity, destination

Name the models by their codes, the quantity of each and the destination port or city. The quotation confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.

Models
Use the codes above; several models can share one request.
Quantity
State the quantity of each model.
Destination
Your port or city, with the country.

Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.

Required

Add optional project details

We acknowledge your request within one business day. You receive an initial written assessment — or a request for the missing information — within two business days.

Your inquiry is reviewed by Sinospect and handled under our Privacy Policy. Any factory disclosure needed for the project is agreed with you separately. For highly sensitive material, request a protected exchange before sending the files.

Questions buyers ask first

Can one pit hold 14 baskets?

No. Units have up to seven or eight baskets; the 70-bird layout is two seven-basket pits side by side with the motors on the outer ends.

Are 316 stainless baskets available?

No. The quoted builds use 304 stainless steel for the body and the baskets.

What is needed for a quotation?

The kitchen wall length, the door width, the supply voltage and the number of birds per service.

Other priced offers

Prices published 10 October 2026, FOB the port stated, for the quantities shown. Indicative until confirmed on a dated quotation, which stays valid for the period it states.