Priced offer · hospital supplies
PPE and sterilisation consumables, priced per piece
Consumables for hospital stores and tender suppliers, priced per piece at carton or pallet quantities and supplied on Sinospect's invoice with a lot inspection before shipment. The certificate position of each item is stated as it stands.

- per sheet, SMS wrap 60 × 60 cm, 10,000 sheets
- USD 0.068
- per isolation gown, AAMI level 2, 10,000 gowns
- USD 0.36
- per box of 50 type IIR masks, 200,000 masks
- USD 0.67
Models and prices
Find the right configuration
Prices are per unit in US dollars, FOB the Chinese port stated, at the quantity shown. A dated quotation confirms the price and the delivery point for your quantities.
The models compared
Open comparisonClose comparison
| Specification | ST-WRAP | ST-POUCH | PP-GOWN | PP-MASK |
|---|---|---|---|---|
| Price | USD 0.017per sheet, from 20,000 sheets, 30 × 30 cm SMS USD 0.068per sheet, from 10,000 sheets, 60 × 60 cm SMS USD 0.257per sheet, from 100 cartons, 100 × 100 cm SMMS | USD 0.015per pouch, from 3,000 boxes of 200, 135 × 260 mm | USD 0.36per gown, from 10,000 gowns, level 2, size L USD 0.74per gown, from 10,000 gowns, level 3 USD 1.56per gown, from 10,000 gowns, level 4 USD 0.20per gown, from 20,000 gowns, CPE film | USD 0.67per box of 50, from 200,000 masks |
| Price basis | FOB Shanghai | FOB Shanghai | FOB Shanghai | FOB Shanghai |
| Material | SMS or SMMS, 60 g | — | — | — |
| Sizes | 30 × 30, 60 × 60 and 100 × 100 cm; other sizes quoted | Eight sizes; 135 × 260 mm priced, others quoted | Level 2 priced in L; other sizes quoted | — |
| Format | — | Self-seal, 200 per box | — | — |
| Levels | — | — | AAMI level 2, 3 and 4; CPE film gown | — |
| Type | — | — | — | Type IIR surgical, three-ply, ear loops |
| Pack | — | — | — | Box of 50 |
| Sterility | — | — | — | EO-sterilised as quoted; the sterility report is requested |
| Lead time | About three weeks after the deposit | About three weeks after the deposit | About three weeks after the deposit | About three weeks after the deposit |
Nitrile examination gloves are quoted only from makers holding CE marking or an FDA 510(k); on request.
Each lot is inspected before shipment against the sample approved with the quotation: construction, dimensions, packaging markings and lot labels, with photographs in the report.
Supply terms
What the price includes
Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.
Engagement modelsOne quotation, one invoice
Sinospect quotes, contracts and invoices as the supplier. The quotation states the product series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.
Inspection before shipment
Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.
FOB a named Chinese port
Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.
Warranty through Sinospect
A warranty issue comes to Sinospect, which investigates against the agreed specification and acceptance evidence and coordinates the remedy with the maker.
Documents and conformity
Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.
Request a quotation
Model, quantity, destination
Name the models by their codes, the quantity of each and the destination port or city. The quotation confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.
- Models
- Use the codes above; several models can share one request.
- Quantity
- State the quantity of each model.
- Destination
- Your port or city, with the country.
Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.
Questions buyers ask first
Can one shipment combine items?
Yes. Items are consolidated in Shanghai; each keeps its own minimum quantity.
Which certificates ship with the goods?
The maker's declaration and the certificates named per item. Where a certificate has lapsed, the item is not shipped until a current one is on file.
Are tender documents supported?
Yes. Specification sheets, certificate copies and samples are supplied for the tender file before the order.
Other priced offers
- Hospital beds
- Wheelchairs
- Charcoal rotisserie pits
- Diesel engines for generator sets
- Generating sets
- All priced offers
Prices published 10 October 2026, FOB the port stated, for the quantities shown. Indicative until confirmed on a dated quotation, which stays valid for the period it states.