Skip to content

Priced offer · healthcare equipment

Hospital beds, manual and electric

Two-crank and three-crank manual beds and three-function electric beds, supplied on Sinospect's invoice with an inspection of the order before it ships. Each model lists its price per bed at the quantity shown, the test reports on file and the lead time stated by the maker.

Three-function electric hospital bed with folding side rails and an IV pole
per bed, two-crank manual, 20 beds
USD 120
per bed, electric, 20 beds
USD 296
after the deposit, by model
2 to 6 weeks

Models and prices

Find the right configuration

Compare specifications
Choose a hospital beds model

Select a model

5 models

Two-crank manual hospital bed with raised back section and folding side rails

HB-M2

Two-crank manual bed

Back and leg sections on two folding cranks, fixed height, guardrails and mattress included.

USD 120per bed

From 20 beds

FOB Chinese port

Lead time. Two to three weeks after the deposit

Articulation
Back 0 to 75°, leg 0 to 45°, two folding cranks
Load
Maker states 250 kg; the maker's two-crank bed passed a 240 kg static test in a laboratory report (2025)
Height
Fixed, 50 cm
Ends and rails
ABS head and foot boards, guardrails
Included
6 cm mattress, IV pole, drainage hook
Packing
Plain export carton

Documents. Maker's declaration of conformity and a laboratory static load test report (2025) on the maker's two-crank bed. An IEC 60601 report for this model is requested.

Three-crank manual hospital bed with the back section raised

HB-M3

Three-crank manual bed

As HB-M2 with a third crank for deck height, six-bar stainless rails.

USD 166per bed

From 20 beds

FOB Chinese port

Lead time. Two to three weeks after the deposit

Articulation
Back 0 to 75°, leg 0 to 45°
Height
420 to 680 mm on the third crank
Load
Static load 250 kg, stated by the maker
Rails
Six-bar stainless steel, folding
Casters
4-inch with brakes
Included
6 cm mattress
Mass
68 kg

Documents. Maker's declaration of conformity; IEC 60601 report requested.

Electric hospital bed with aluminium folding side rails and raised back

HB-E3S

Three-function electric bed

Electric back, leg and height, 115 V or 230 V, detachable ABS ends.

USD 296per bed

From 20 beds

FOB Chinese port

Lead time. Two to three weeks after the deposit

Functions
Electric back, leg and height
Deck
90 × 195 cm
Height
42 to 68 cm
Articulation
Back 75°, leg 45°
Load
Static load 250 kg, stated by the maker
Supply
115 V 60 Hz or 230 V 50 Hz, plug to match
Included
6 cm mattress, IV pole, drainage hook
Mass
78 kg

Documents. Maker's declaration of conformity; no IEC 60601-2-52 report on file for this model.

Electric hospital bed with ABS folding rails, raised back and knee sections

HB-E3D

Electric bed, ABS rails, 40 cm low deck

Three functions, 40 to 70 cm deck height, ABS folding rails with angle indicator, actuator options.

USD 447per bed

From 10 beds

USD 431per bed

From 100 beds

FOB Dalian

Lead time. About four weeks for 10 beds, about six weeks for 100

Functions
Electric back, knee and height
Deck
192.5 × 90 cm
Height
40 to 70 cm
Articulation
Back 75° ± 10°, knee 35° ± 10°
Load
Safe working load 250 kg, as quoted
Supply
115 V 60 Hz available; US plug on request
Rails and ends
ABS folding rails, ABS ends with angle indicator
Included
8 cm mattress
Packed
210 × 108 × 52 cm, up to 145 kg

Documents. Maker's CE declaration under EU MDR 2017/745, Class I, citing EN 60601-2-52 and EN 60601-1. No third-party test report on file.

  • TiMOTION actuators: USD 23 more per bed
  • LINAK actuators: USD 60 more per bed
Electric hospital bed with aluminium rails, IV pole and handset

HB-E3L

Electric bed, LINAK actuators, tested model

Three functions on LINAK actuators, IEC 60601-2-52 test report on file, 100 to 240 V.

USD 563per bed

From 50 beds

USD 543per bed

From 100 beds

FOB Shanghai

Lead time. About six weeks after the deposit

Functions
Electric back, knee and height
Deck
83 × 193 cm
Articulation
Back 84°, knee 47°
Load
Safe working load 250 kg on the test report
Supply
100 to 240 V, 50/60 Hz, US plug fitted; IPX4
Actuators
LINAK
Patient mass
135 kg on the report on file; the maker states 175 kg and an updated report is requested

Documents. IEC 60601-2-52 test report (third-party laboratory, 2023) and CE declaration, Class I, on file. 12-month warranty from Sinospect.

Prices are per unit in US dollars, FOB the Chinese port stated, at the quantity shown. A dated quotation confirms the price and the delivery point for your quantities.

The models compared

Specification comparison of the hospital beds models
SpecificationHB-M2HB-M3HB-E3SHB-E3DHB-E3L
Price

USD 120per bed, from 20 beds

USD 166per bed, from 20 beds

USD 296per bed, from 20 beds

USD 447per bed, from 10 beds

USD 431per bed, from 100 beds

USD 563per bed, from 50 beds

USD 543per bed, from 100 beds

Price basisFOB Chinese portFOB Chinese portFOB Chinese portFOB DalianFOB Shanghai
ArticulationBack 0 to 75°, leg 0 to 45°, two folding cranksBack 0 to 75°, leg 0 to 45°Back 75°, leg 45°Back 75° ± 10°, knee 35° ± 10°Back 84°, knee 47°
LoadMaker states 250 kg; the maker's two-crank bed passed a 240 kg static test in a laboratory report (2025)Static load 250 kg, stated by the makerStatic load 250 kg, stated by the makerSafe working load 250 kg, as quotedSafe working load 250 kg on the test report
HeightFixed, 50 cm420 to 680 mm on the third crank42 to 68 cm40 to 70 cm—
Ends and railsABS head and foot boards, guardrails————
Included6 cm mattress, IV pole, drainage hook6 cm mattress6 cm mattress, IV pole, drainage hook8 cm mattress—
PackingPlain export carton————
Rails—Six-bar stainless steel, folding———
Casters—4-inch with brakes———
Mass—68 kg78 kg——
Functions——Electric back, leg and heightElectric back, knee and heightElectric back, knee and height
Deck——90 × 195 cm192.5 × 90 cm83 × 193 cm
Supply——115 V 60 Hz or 230 V 50 Hz, plug to match115 V 60 Hz available; US plug on request100 to 240 V, 50/60 Hz, US plug fitted; IPX4
Rails and ends———ABS folding rails, ABS ends with angle indicator—
Packed———210 × 108 × 52 cm, up to 145 kg—
Actuators————LINAK
Patient mass————135 kg on the report on file; the maker states 175 kg and an updated report is requested
Lead timeTwo to three weeks after the depositTwo to three weeks after the depositTwo to three weeks after the depositAbout four weeks for 10 beds, about six weeks for 100About six weeks after the deposit

Each bed ships with the maker's declaration of conformity and the test reports listed for its model. A model without a third-party report is marked as such; a report can be commissioned before shipment and is quoted per order.

Registration with the destination's medical device authority and import conformity programmes (SONCAP, PVoC, SABER and similar) are quoted per order.

In detail

The electric configuration

Electric three-function bed as quoted for HB-E3S: 115 V or 230 V supply, 90 × 195 cm deck, mattress and IV pole included.

Electric hospital bed, back raised, with rails and casters

Supply terms

What the price includes

Payment: a deposit with the order and the balance before shipment, after the inspection report; the split is set on the quotation.

Engagement models
One quotation, one invoice

Sinospect quotes, contracts and invoices as the supplier. The quotation states the product series; the order contract names the maker and its plant, with the sample or drawing the order is built to. Certificate copies are supplied with the order contract, or before the order for a tender file.

Inspection before shipment

Sinospect inspects the order against the specification and the approved sample before it ships and sends the photo report. The maker's final balance is paid after that inspection passes.

FOB a named Chinese port

Prices include export packing and loading at the port stated. Ocean or air freight, insurance, duties and destination clearance are quoted on request or handled by the buyer's forwarder.

Warranty from Sinospect

Equipment you buy from Sinospect carries our own warranty: you claim from us, and we deal with the maker. It covers defects in materials and workmanship for 12 months from commissioning, or from delivery where no commissioning is needed, and ends no later than 18 months after shipment. Generating sets and engines: 12 months or 1,200 running hours, whichever comes first. Where the maker gives a longer warranty, the longer term passes to you. We repair or replace the faulty part and ship parts at our cost; if an engineer has to visit you abroad, the visit is quoted before anyone travels.

Documents and conformity

Commercial invoice, packing list, the maker's declaration and the test reports listed per model ship with the goods. Certificate-of-conformity programmes at the destination are quoted per order.

Request a quotation

Model, quantity, destination

Name the models by their codes, the quantity of each and the destination port or city. The quotation confirms the price for your quantities and sets the delivery point, the payment split and the inspection before shipment.

Models
Use the codes above; several models can share one request.
Quantity
State the quantity of each model.
Destination
Your port or city, with the country.

Sinospect Industrial Company Limited, Hong Kong. Operating offices in Hong Kong and Ningbo. Supplying industrial equipment from China since 2004.

Required

Add optional project details

We acknowledge your request within one business day. You receive an initial written assessment — or a request for the missing information — within two business days.

Your inquiry is reviewed by Sinospect and handled under our Privacy Policy. Any factory disclosure needed for the project is agreed with you separately. For highly sensitive material, request a protected exchange before sending the files.

If this form does not send, email jk@sinospect.com.

Questions buyers ask first

Can an order mix models?

Yes. Each model carries its own minimum quantity; an order below a model's minimum is quoted at that model's small-lot price.

Can the beds carry our brand?

Private labels, colours and packaging markings are quoted per order with the maker's minimum for the change.

How is a bed inspected before shipment?

Sinospect checks the order against the specification and the sample approved with the quotation, with photographs of articulation, rails, casters, labels and packing, and sends the report before the balance is paid.

Which test reports exist?

HB-E3L has an IEC 60601-2-52 report from a third-party laboratory. The other models carry the maker's declarations; a laboratory report for any of them is quoted per order.

Other priced offers

Prices published 10 October 2026, FOB the port stated, for the quantities shown. Indicative until confirmed on a dated quotation, which stays valid for the period it states.